Radon Chart overview
This article describes the Radon Chart page: the two-week grid, inspector rows, time-frame buttons, theme toggle, and corner menu actions. It matches the in-app description: levels for each inspector over about the past two weeks into the near future.
Written By Ryan Wagner
Last updated About 1 month ago
Where to find it
Click Radon Chart in the main sidebar (
/radon).
When you can use it
The page checks for scheduler-type calendar access (the same broad group used for dispatch-style roles in navigation). If you are blocked, ask an administrator to grant Radon Chart access.
If settings are missing
You may see Radon Settings Not Found with text that you must add equipment information first.
Button: Go to Settings β sends you to Settings radon configuration (
/settings/radon).
What the chart shows
A table with columns for days and hourly slots across about two weeks.
Row headers: Inspector and Ends (ending counts / balances used in the chart logic).
Each cell reflects scheduled radon usage for that inspector and time bucket based on live data from your company.
Time-frame buttons across the top use titles from your Radon Settings (only entries marked in use appear). Click a button to change the timeGap grouping (for example wider or narrower blocks).
A light/dark Switch at the top toggles theme (sun/moon icons). The choice is saved to your user settings so it returns on your next visit.
While refreshing, a small Spinner can appear in the header area.
Corner menu (floating actions)
Calibration Transfer β adds
?calibration=newto open calibration flow.View Radon Data β goes to
/radon/data.Radon Settings β goes to
/settings/radon.
After you change settings or calibration
The chart can refresh from the server; use View Radon Data if you need the detailed data view.
Caveats
Accurate counts depend on complete Radon Settings (equipment totals, time frames, and in-use flags). Incomplete setup triggers the Radon Settings Not Found state.
The chart is a planning view; always confirm device custody and field procedures with your companyβs standard operating procedures.
Need help
Configure hardware and time frames under Settings (see Settings overview and where to configure features for the menu path to radon settings).
For inspector scheduling context, read Inspector Calendar and Office Calendar.